resources

publications and articles


2020 World Record CIPL 42”

2020 World Record CIPL 42”

2020 Trenchless Perspective

2020 Trenchless Perspective

2019 NDT Cast Iron Condition

2019 NDT Cast Iron Condition

 
2019 Trenchless Technology

2019 Trenchless Technology

2017 FRP & CIPL

2017 FRP & CIPL

2016 Barriers to CIPL in N. America

2016 Barriers to CIPL in N. America

abstracts by george ragula


2019 No-Dig NASTT- World Record Cured-in-Place Liner (CIPL) Renewal of Natural Gas Main 

2018 No-Dig NASTT - High Pressure (HP) Natural Gas Main Cured-In-Place Liner (CIPL) Renewal Project Through Golf Course

2018 WGC- Use of Fiber-Reinforced Polymers (FRP) for Use in Cured-In-Place-Liner (CIPL) Renewal

2015 No-Dig NASTT-DESIGN CONSIDERATIONS – FIRST APPLICATION of a CIP LINER in a 42-inch DIAMETER GAS MAIN

2014 No-Dig NASTT - Expanding the Use of Pipe Splitting For Low Pressure Gas Services

2013 No-Dig NASTT - Big-Time Rehabilitation – PSE&G Tackles Largest CIPL Project in USA with New Liner

2009 WGC - Trenchless Gas INSTALLING EXCESS FLOW VALVES WITHOUT EXCAVATION

2008 No-Dig NASTT -UV CURING FOR NATURAL GAS LINERS

2007 AGA - Evaluation of Flowable Fill around Utility Pipes

2006 No-Dig NASTT Trenchless Gas Excess Flow Valve (EFV) Installation

2005 AGA -  Robotics Technology Goes “Live” for Repairing Gas Mains

2005 No-Dig NASTT - SECOND GENERATION CCTV EQUIPMENT FOR INSPECTING LIVE GAS MAINS

2004 IGRC - VACUUM EXCAVATION IN THE PRESENCE OF FLAMMABLE GASES

2004 No-Dig NASTT -“LIVE” REPAIR OF GAS MAINS USING ROBOTICS TECHNOLOGY

2003 AGA - Long-Term Performance of Cross-Linked PE (PEX)

2003 AGA - An Evaluation of a Third-Party Damage Detection System Using a Fiber Optic Cable

2003 GTI Investigating Pipeline Integrity Using Broadband Electromagnetic Technology (BEM)

2003  LINING CHALLENGES UNDER INTERSTATE ROUTE 80 - PSE&G Newark, New Jersey

2002 AGA - Using Vacuum Excavation Equipment in the Presence of Natural Gas

2001 Cured-In-Place Liners Meet Unique Gas Applications - Distribution Technology, Public Service Electric and Gas

2000 No-Dig NASTT Innovative Size-for-Size PE Pipe Replacement Techniques